not approved
Scale: Nationwide Innovation Hubs
Current Project Status
Unfunded
Amount
Received
$0
Amount
Requested
$1,500
Percentage
Received
0.00%
Solution

There are more than 30 countrywide hubs in Kenya that reach out to the community. We will partner with t these hubs to grow Cardano

Problem

Working with one hub at a time will take too long to achieve what is needed to scale. There is an existing infrastructure of hubs for scale

Addresses Challenge
Feasibility
Auditability
close

Playlist

  • EP2: epoch_length

    Authored by: Darlington Kofa

    3m 24s
    Darlington Kofa
  • EP1: 'd' parameter

    Authored by: Darlington Kofa

    4m 3s
    Darlington Kofa
  • EP3: key_deposit

    Authored by: Darlington Kofa

    3m 48s
    Darlington Kofa
  • EP4: epoch_no

    Authored by: Darlington Kofa

    2m 16s
    Darlington Kofa
  • EP5: max_block_size

    Authored by: Darlington Kofa

    3m 14s
    Darlington Kofa
  • EP6: pool_deposit

    Authored by: Darlington Kofa

    3m 19s
    Darlington Kofa
  • EP7: max_tx_size

    Authored by: Darlington Kofa

    4m 59s
    Darlington Kofa
0:00
/
~0:00