completed
Proposal Framework Tool - AIM
Current Project Status
Complete
Amount
Received
$8,500
Amount
Requested
$8,500
Percentage
Received
100.00%
Solution

Add an additional 3rd framework, the UN planetary pressures adjusted Human Development Index, ready for proposers in the AIM Proposer Tool.

Problem

Creating robust Catalyst proposals can be difficult. Connection with existing structures and frameworks is time consuming.

Addresses Challenge
Feasibility
Auditability
close

Playlist

  • EP2: epoch_length

    Authored by: Darlington Kofa

    3m 24s
    Darlington Kofa
  • EP1: 'd' parameter

    Authored by: Darlington Kofa

    4m 3s
    Darlington Kofa
  • EP3: key_deposit

    Authored by: Darlington Kofa

    3m 48s
    Darlington Kofa
  • EP4: epoch_no

    Authored by: Darlington Kofa

    2m 16s
    Darlington Kofa
  • EP5: max_block_size

    Authored by: Darlington Kofa

    3m 14s
    Darlington Kofa
  • EP6: pool_deposit

    Authored by: Darlington Kofa

    3m 19s
    Darlington Kofa
  • EP7: max_tx_size

    Authored by: Darlington Kofa

    4m 59s
    Darlington Kofa
0:00
/
~0:00