funded
Gimbalabs - Flagship Course for Aiken
Current Project Status
In Progress
Amount
Received
₳108,000
Amount
Requested
₳200,000
Percentage
Received
54.00%
Solution

Prepare one of the flagship courses in Gimbalabs - Project Based Learning for Aiken (AikenPBL).

Problem

Onboarding developers to build on Cardano is difficult and there is a lack of beginner friendly education materials for on-chain code development.

Impact Alignment
Feasibility
Feasibility
Value for Money
Impact Alignment

Gimbalabs

4 members

Gimbalabs - Flagship Course for Aiken

Please describe your proposed solution

Prepare one of the flagship courses in Gimbalabs - Project Based Learning for Aiken (AikenPBL).

The PBL course would come with firstly a scientifically-carefully designed course story, riding on it to build the core skeleton of the course - modules. On each module, there would be several Student Learning Targets (SLTs). For each SLT, it consist of below’s content:

  • Written lessons to guide students through all SLTs involved
  • Code examples to assist the delivery of SLTs
  • Video explanation covering all SLTs
  • Assignment for consolidating learning outcomes for students

The course delivery could either be fully remote, where students watch the video to grasp the basics, or deliver in a physical setting - where Gimbalabs HK is piloting to deliver it to the wider public in Hong Kong.

In Gimbalabs, there would also be regular online meetups & community hosted to guide learners through the course.

Please define the positive impact your project will have on the wider Cardano community

The Cardano ecosystem has long been in shortage of talents and developers to bring ideas to live. With years of experience of producing quality developer education material, Gimbalabs’ AikenPBL would become one of the first few materials to onboard new minds and developers onto Cardano ecosystem, fostering more impactful projects and massively drive Cardano adoption.

What is your capability to deliver your project with high levels of trust and accountability? How do you intend to validate if your approach is feasible?

At Gimbalabs, we have built one of the best technical learning technologies in the Cardano ecosystem, with the ability to extract the fundamentals of complex topics (protocols, tooling, infrastructure, design patterns, etc) and package them into skills. That is our know-how.

Trust and accountability:

Approach validation:

  • Gimbalabs started with this successful Fund2 Proposal: https://gimbalabs.com/fund2.pdf (and scored the leading vote tally in Fund1 - before there was real funding)
  • Has delivered 4 iterations of Plutus PBL Course, with 5th iteration, Plutus PBL 2024, launching now, in May 2024
  • Host of weekly Playground sessions for 3+ years
  • Host of twice-weekly (and now more!) Live Coding sessions for 2+ years
  • Gimbalabs YouTube is a helpful archive:

Feasibility of implementation:

  • Talents: Gimbalabs consists of a group of educators and diverse professionals. The budget would be easily justified by the collective professional hours contributed to deliver one of the best courses on the Cardano ecosystem we strive to be.
  • Approach: With the 4+ iterations of Plutus PBL Course, Gimbalabs is proven the expert of delivering such education materials.
  • Platform: Gimbalabs founds Andamio, which is a highly effective education platform built on Cardano, natively as the best platform of delivering Cardano education materials.
  • Know-how: Gimbalabs gathers a group of expert software engineer with extremely deep knowledge in the course content to be produced.

<https://www.youtube.com/c/gimbalabs>

What are the key milestones you need to achieve in order to complete your project successfully?

Milestone 1: Milestone 1: Proposal onboarding &amp; Planning (1 Month)

Objective: Proposal onboarding, assembling the team, and defining project management practices.

Activities:

  • Confirm core team members.
  • Establish project management tools.
  • Successful project onboarding on project catalyst

Acceptance Criteria:

  • Public announcement on core team members and advisors.
  • Project management tools and systems set up.
  • Successful project onboarding on project catalyst

Milestone 2: Milestone 2: AikenPBL Course Modules Design (1 Month)

Objective: Design of AikenPBL course story

Activities:

  • Construct the overall story of AikenPBL
  • Conduct live session to deliver the draft course story

Acceptance Criteria:

  • A public documentation on course story and course modules
  • Recorded live discuss session of delivering the course modules to Gimbalabs community

Milestone 3: Milestone 3: Finalize Modules &amp; SLTsDesign (1 Month)

Objective: Confirming modules and designing SLTs for each module

Activities:

  • Revise the course modules and story according to the feedback gathered from live session
  • On top of each module, curate SLTs as groundwork of lesson writing
  • Conduct live session to deliver the draft course story

Acceptance Criteria:

  • A public documentation on confirmed course modules with detail module SLTs
  • Recorded live discuss session of delivering the course modules &amp; SLTs to Gimbalabs community

Milestone 4: Milestone 4: Course Content Creation Part 1 (1 Month)

Objective: AikenPBL course content creation part 1

Activities:

  • Deliver 100 modules course content, including
  • Write up lessons to guide students through all SLTs involved
  • Code examples to assist the delivery of SLTs
  • Video explanation covering all SLTs
  • Assignment for consolidating learning outcomes for students

Acceptance Criteria:

  • For all the course content listed above, provide publicly accessible URL(s) for reviewing all the content.

Milestone 5: Milestone 5: Course Content Creation Part 2 (1 Month)

Objective: AikenPBL course content creation part 2

Activities:

  • Deliver 200 &amp; 300 modules
  • Write up lessons to guide students through all SLTs involved
  • Code examples to assist the delivery of SLTs
  • Video explanation covering all SLTs
  • Assignment for consolidating learning outcomes for students

Acceptance Criteria:

  • For all the course content listed above, provide publicly accessible URL(s) for reviewing all the content.

Final Milestone: Final Milestone: Publishing &amp; Proposal Close-out

Objective: Publish course on Andamio Instance and prepare close-out report

Activities:

  • Publish all the course content created above in managed Andamio instance
  • Prepare the project close-out report and video

Acceptance Criteria:

  • Publicly accessible link to all the course information listed on Andamio
  • Publicly available project close-out report and video

Who is in the project team and what are their roles?

James Dunseith - Educator, Course Content Designer

Hinson Wong - Lead Course Content Writer

Gimbalabs Community - Course Content Writer(s) / Editor(s)

Please provide a cost breakdown of the proposed work and resources

Milestone 1: Proposal onboarding &amp; Planning (1 Month)

Activities Budget:

  • ADA 20,000 - Confirm core team members.
  • ADA 5,000 - Establish project management tools.
  • ADA 5,000 - Successful project onboarding on project catalyst
  • Total Budget - ADA 30,000

Milestone 2: AikenPBL Course Modules Design (1 Month)

Activities Budget:

  • ADA 35,000 - Construct the overall story of AikenPBL
  • ADA 5,000 - Conduct live session to deliver the draft course story
  • Total Budget - ADA 40,000

Milestone 3: Finalize Modules &amp; Student Learning Targets (SLTs) Design (1 Month)

Activities Budget:

  • ADA 5,000 - Revise the course modules and story according to the feedback gathered from live session
  • ADA 30,000 - On top of each module, curate SLTs as groundwork of lesson writing
  • ADA 5,000 - Conduct live session to deliver the draft course story
  • Total Budget - ADA 40,000

Milestone 4: Course Content Creation Part 1 (1 Month)

Activities Budget:

  • Deliver 100 modules course content, including
  • ADA 7,500 - Write up lessons to guide students through all SLTs involved
  • ADA 7,500 - Code examples to assist the delivery of SLTs
  • ADA 7,500 - Video explanation covering all SLTs
  • ADA 7,500 - Assignment for consolidating learning outcomes for students
  • Total Budget - ADA 30,000

Milestone 5: Course Content Creation Part 2 (1 Month)

Activities Budget:

  • Deliver 200 &amp; 300 modules
  • ADA 7,500 - Write up lessons to guide students through all SLTs involved
  • ADA 7,500 - Code examples to assist the delivery of SLTs
  • ADA 7,500 - Video explanation covering all SLTs
  • ADA 7,500 - Assignment for consolidating learning outcomes for students
  • Total Budget - ADA 30,000

Final Milestone: Publishing &amp; Proposal Close-out

Activities Budget:

  • ADA 10,000 - Publish all the course content created above in managed Andamio instance
  • ADA 20,000 - Prepare the project close-out report and video
  • Total Budget - ADA 30,000

No Dependencies

How does the cost of the project represent value for money for the Cardano ecosystem?

The Cardano ecosystem has long been in shortage of talents and developers to bring ideas to live. With years of experience of producing quality developer education material, Gimbalabs’ AikenPBL would become one of the first few materials to onboard new minds and developers onto Cardano ecosystem, fostering more impactful projects and massively drive Cardano adoption.

Gimbalabs consists of a group of educators and diverse professionals. The budget would be easily justified by the collective professional hours contributed to deliver one of the best courses on the Cardano ecosystem we strive to be.

close

Playlist

  • EP2: epoch_length

    Authored by: Darlington Kofa

    3m 24s
    Darlington Kofa
  • EP1: 'd' parameter

    Authored by: Darlington Kofa

    4m 3s
    Darlington Kofa
  • EP3: key_deposit

    Authored by: Darlington Kofa

    3m 48s
    Darlington Kofa
  • EP4: epoch_no

    Authored by: Darlington Kofa

    2m 16s
    Darlington Kofa
  • EP5: max_block_size

    Authored by: Darlington Kofa

    3m 14s
    Darlington Kofa
  • EP6: pool_deposit

    Authored by: Darlington Kofa

    3m 19s
    Darlington Kofa
  • EP7: max_tx_size

    Authored by: Darlington Kofa

    4m 59s
    Darlington Kofa
0:00
/
~0:00