Elevated Project Management Process
Current Project Status
Unfunded
Amount
Received
$0
Amount
Requested
$12,000
Percentage
Received
0.00%
Solution

Evaluate and Pilot a Professional Project Management product that is fully mature to operate in parallel with the existing auditing process.

Problem

As the number of funded projects grow it becomes more difficult to Audit their progress and Monitor their impact using the existing process.

Addresses Challenge
Feasibility
Auditability

Team

3 members

close

Playlist

  • EP2: epoch_length

    Authored by: Darlington Kofa

    3m 24s
    Darlington Kofa
  • EP1: 'd' parameter

    Authored by: Darlington Kofa

    4m 3s
    Darlington Kofa
  • EP3: key_deposit

    Authored by: Darlington Kofa

    3m 48s
    Darlington Kofa
  • EP4: epoch_no

    Authored by: Darlington Kofa

    2m 16s
    Darlington Kofa
  • EP5: max_block_size

    Authored by: Darlington Kofa

    3m 14s
    Darlington Kofa
  • EP6: pool_deposit

    Authored by: Darlington Kofa

    3m 19s
    Darlington Kofa
  • EP7: max_tx_size

    Authored by: Darlington Kofa

    4m 59s
    Darlington Kofa
0:00
/
~0:00