not approved
DLT360: MVP for Fund12 - DAO based Corporate Idea & Innovation Management Platform
Current Project Status
Unfunded
Amount
Received
₳0
Amount
Requested
₳150,000
Percentage
Received
0.00%
Solution

MVP Version of a DAO-supported Idea & Innovation Management Environment for business and industry, with Processes & Tools as drafted by our Fund 12-funded project (1200104).

Problem

DAOs are popular within the Web3.0 space, but very little understood among decision makers in established businesses & industries. Corporate governance and legal setups are not yet prepared for DAOs.

Image file

Impact Alignment
Feasibility
Value for money

DLT360 Consulting

4 members

DLT360: MVP for Fund12 - DAO based Corporate Idea & Innovation Management Platform

Please describe your proposed solution

Please note:

The DAO Use-Cases for the Corporate World Concept was funded by Fund 12 (Project 1200104). This did lead to selecting "Idea & Innovation Management" as the most promising area, where DAO-based processes and tools can add value.

Why do Business and Industry need DAO-supported Idea & Innovation Management?

Most businesses struggle with picking the brains of their employees, suppliers, customers and consumers. This is mainly due to working in strictly hierarchic functional silos. There are many shiny presentations and brochures about "Servant Leadership" in the corporate world, but when it comes to Ideation and Innovation, the existing structures, processes and tools do not mirror this openness at all. Many blue-collar workers would have great improvement ideas, but are simply worried to post them on exiting Web2.0 tools, as their immediate supervisor might feel bypassed and insulted. Furthermore, reaching to to pick the brains of suppliers, customers and consumers typically runs into Identity and Access Management (IAM) hurdles, introducing critical legal risks around Personally Identifiable Information (PII), Intellectual Property Rights (IPR) and simple lacking trust and motivation blocking engagement.

.

Purpose of a DAO-supported Innovation Management Environment

DAO-based processes and tools can be a very powerful solution for overcoming the above listed issues and for creating motivated, idea-sharing communities of today unachieved diversity and inclusion.

Deliverables of this MVP Phase

DAO-supported Idea & Innovation Management has the potential to become the center of a large innovation ecosystem. Due the huge potential in this area, this needs to be developed in iterative steps and will potentially grow towards full functionality over many, many years. Therefore, the MVP PHASE needs to focus on highly valuable core-elements of the future ecosystem, small enough to allow a MVP-style approach, but big enough to attract real-world customers at such an early stage. This MVP Phase is focusing on the following deliverables:

  • MVP Website
  • MVP Demo Application
  • Requirements Specification
  • Solution Specification
  • Business Model Specification
  • Deck & Pitch-Video
  • Development Specification (for later Product Development)
  • Internal security & legal clarifications

Image file

Core-functionalities of the Web3.0 MVP Application

This MVP development phase focuses on UX design and on the demo-system-based core-functionalities for Idea & Innovation Management as outlined in the deliverables of our Fund 12 Project (1200104).

Summary & Next Steps

The auditShare MVP is a key-element of our overall DLT360 business approach. This (together with our other proposals submitted to Fund 13) is an important milestone in succeeding with our lean and iterative startup strategy.

Please define the positive impact your project will have on the wider Cardano community

Value to the Cardano Community:

  • Bringing industrial adoption to Cardano - the proposal is increasing the outreach of Cardano to industrial clients, who will be involved in the specification process, Proof-of-Concept (PoC), in subsequent developments and implementations. This application has the potential to scale very rapidly, thus driving the adoption of Cardano in the supply chain automation area.

  • Proximity and compliance with the emerging European NGI initiatives and solutions (NGI: Next Generation Internet initiatives within the European Digital Decade 2030 program)

  • Utilization of latest Web 3.0 architectures

  • Increase of transaction volume and usage - Based on this potential to drive a high transaction volume, there will be a positive effect on the overall market position of Cardano, once the real applications are developed and implemented at scale.

How to measure the impact ?

To measure the success of the project, we will employ a combination of quantitative and qualitative measures. The following are some key areas we intend to measure:

  • Measuring the impact of this DAO Concept Project
  1. Number of business and industry experts attracted and interested
  2. Number of business and industry experts involved in specification process and PoC
  3. Number of Cardano Community members and projects involved
  • Measuring later impact of actual development (not subject to this proposal)
  • Measuring final impact of implementing at scale (not subject of this proposal)

How we will share the outputs and opportunities that result from this project?

The way we plan to make the results of this project available has been described in the 'Open Source Section' earlier in this proposal. Due to the nature of the project, this will be a mix of publicly available and not publicly available outputs (this is unavoidable due to the nature of the resulting outputs).

The publicly available parts of our outputs will be shared as following:

  • Over the DLT360 Website
  • Over LinkedIn and YouTube (the promotional elements)
  • By delivering to the Cardano Catalyst Community based on the valid reporting standards

What is your capability to deliver your project with high levels of trust and accountability? How do you intend to validate if your approach is feasible?

DLT360 was founded by an ambitious core-team coming from many years of leadership experience in business and industry, combined with the fresh perspective of young talents in various disciplines (see CVs and team description later in this proposal). The senior founders have also been active members of and contributors to the Catalyst community since early-on. DLT360 has successfully completed all earlier projects from Fund 6, 7, 8 and 11. This project is now a major element of orchestrating many of the previous projects, making us finally ready for scaling up the work with Corporate Clients from business and industry.

Our team (including the closely linked free-lancers) has many years of experience in:

  • Innovation Management
  • Specific knowledge about industrial process and supply-chain transformation
  • Specific knowledge of activities and regulations of the European Union
  • Strong network to key-players within industry, academia and within the various EU-initiatives
  • Expert-level knowledge about Enterprise Architecture Frameworks
  • Expert-level knowledge about Quality Management according to ISO9001 and Cybersecurity according to ISO27001
  • Expert-level knowledge about Business Model & Value Proposition Development
  • Expert-level knowledge about UX, design and branding
  • Expert-level knowledge about Program Management, Project Management and Scrum (Scrum of Scrum)
  • Access to full-stack development resources
  • Expert Knowhow in business administration, controlling and reporting

We use best-practice infrastructure and tools like e.g. GitHub and MIRO for supporting our collaborative processes and document management.

Our work is periodically shared and discussed with renowned experts from business, industry and academia - all part of a dedicated large LinkedIn network.

What are the key milestones you need to achieve in order to complete your project successfully?

Milestone 1: Milestone Title

Project setup & planning, team formation and updating all essential specifications (Completion: End of month 1 of 12)

Milestone Outputs

  1. Project infrastructure and detailed planning of the project
  2. Updated Requirements Specification (originally established during Fund 12 Concept Phase)
  3. Updated Solution Specification (originally established during Fund 12 Concept Phase)
  4. Updated Business Model Specification (originally established during Fund 12 Concept Phase)
  5. Updated Website, Pitch-Deck and Pitch-Video (originally established during Fund 12 Concept Phase)
  6. Team in place
  7. Kickoff Event

Acceptance Criteria

  1. Project setup including project plan in GitHub completed
  2. Updated Requirements Specification Document released (V02.00)
  3. Updated Solution Specification Document released (V02.00)
  4. Updated Business Model Specification released (V02.00)
  5. Updated Website, Pitch-Deck and Pitch-Video (new release-versions)
  6. Roles defined, people allocated to roles, all properly documented
  7. Kickoff Event held (documented)

Evidence of Milestone Completion

We will deliver a brief video in which we will go through the individual outputs, the acceptance criteria and the evidence. The video will cover:

  1. Showing Github setup and the detailed project planning,
  2. Explaining the updates made to the Requirements Specification Document
  3. Explaining the updates made to the Solution Specification Document
  4. Explaining the updates made to the Business Model Specification Document
  5. Explaining the updates made to the Website, Pitch-Deck and Pitch-Video
  6. Introducing the team with all roles and allocated people
  7. Showing impressions and key-results of the Kickoff Event

Additionally, the validators will get links with read-access to the listed documents

Milestone 2: Milestone Title

First Iteration with focus on Design Thinking oriented Workshops, UX design and Solution Architecture with the main goal to get from the initially specified Baseline approaches to updated target designs based on workshops with deep Subject-Matter-Expert involvement (Completion: End of month 3 of 12)

Milestone Outputs

  1. Design Thinking Workshop 1
  2. Design Thinking Workshop 2
  3. Website Improvement Specification
  4. Business Processes, IAM and Tokenomics Specification Draft
  5. Frontend Development Specification
  6. Web3.0 Backend Development Specification Draft
  7. Migration and Implementation Specification (How to make this to the first Application Blueprint within the DLT360 Business Development Framework) Draft

Acceptance Criteria

  1. Design Thinking Workshop 1 completed and documented
  2. Design Thinking Workshop 2 complete and documented
  3. Released version of Website Improvement Specification (V01.00)
  4. Draft Version of Business Processes, IAM and Tokenomics Specification (V00.10)
  5. Draft Version of Frontend Development Specification (V00.10)
  6. Draft Version of Web3.0 Backend Development Specification (V00.10)
  7. Draft Version of Migration and Implementation Specification (V00.10)

Evidence of Milestone Completion

We will deliver a brief video in which we will go through the individual outputs, the acceptance criteria and the evidence. The video will cover:

  1. Present highlights and results of Design Thinking Workshop 1
  2. Present highlights and results of Design Thinking Workshop 2
  3. Explaining the content of the Website Improvement Specification (V01.00)
  4. Explaining the content of the Business Processes, IAM and Tokenomics Specification Draft (V00.10)
  5. Explaining the content of the Frontend Development Specification Draft (V00.10)
  6. Explaining the content of the Web3.0 Backend Development Specification Draft (V0.10)
  7. Explaining the content of the Migration and Implementation Specification Draft (V00.10)

Additionally, the validators will get links with read-access to the listed documents

Milestone 3: Milestone Title

Rapid Prototyping of Demo Versions of Frontend (UX / UI), simulated Backend, and Tokenomics-Concept. Second Iteration of Solution Architecture and Expert Workshops

(Completion: End of month 7 of 12)

Milestone Outputs

  1. Updated Website
  2. Rapid Prototype of Application Frontend Demo Version
  3. Rapid Prototype of Web3.0 Backend Demo Version (simulation mode)
  4. Updated Requirements Specification
  5. Updated Solution Specification
  6. Updated Business Model Specification
  7. Updated Pitch-Deck and Pitch-Video
  8. Expert Workshop 1
  9. Expert Workshop 2
  10. Updated Website Improvement Specification
  11. Updated version of Business Processes, IAM and Tokenomics Specification
  12. Updated version of Frontend Development Specification
  13. Updated version of Web3.0 Backend Development Specification
  14. Updated version of Migration and Implementation Specification

Acceptance Criteria

  1. Released version of updated Website
  2. Rapid Prototype of Application Frontend Demo Version available
  3. Rapid Prototype of Web3.0 Backend Demo Version (simulation mode) available
  4. Updated Requirements Specification (V02.10)
  5. Updated Solution Specification (V02.10)
  6. Updated Business Model Specification (V02.10)
  7. Updated Pitch-Deck and Pitch-Video
  8. Expert Workshop 1 completed and documented
  9. Expert Workshop 2 completed and documented
  10. Updated Website Improvement Specification (V01.10)
  11. Updated version of Business Processes, IAM and Tokenomics Specification (V0.20)
  12. Updated version of Frontend Development Specification (V00.20)
  13. Updated version of Web3.0 Backend Development Specification (V00.20)
  14. Updated version of Migration and Implementation Specification (V00.20)

Evidence of Milestone Completion

We will deliver a brief video in which we will go through the individual outputs, the acceptance criteria and the evidence. The video will cover:

  1. Detailed explanation of the updated Website
  2. Detailed demonstration of the Application Frontend Demo Version
  3. Detailed demonstration of the simulated Web3.0 Backend Demo Version
  4. Explain the updated Requirements Specification (V02.10)
  5. Explain the updated Solution Specification (V02.10)
  6. Explain the updated Business Model Specification (V02.10)
  7. Explain the updated Pitch-Deck and Pitch-Video
  8. Present highlights and results ofExpert Workshop 1
  9. Present highlights and results ofExpert Workshop 2
  10. Explain the updated Website Improvement Specification (V01.10)
  11. Explain the updated Business Processes, IAM and Tokenomics Specification (V00.20)
  12. Explain the updated Frontend Development Specification (V01.10)
  13. Explain the updated Web3.0 Backend Development Specification (V00.20)
  14. Explain the updated Migration and Implementation Specification (V00.20)

Additionally, the validators will get links with read-access to the listed documents and applications.

Milestone 4: Milestone Title

MVP Demo Version Development, including Backend Simulation of IAM, Smart Contracts, Tokenomics (Completion: End of month 11 of 12)

Milestone Outputs

  1. MVP Version of the Website, supporting the simulation of Business Processes, IAM and Tokenomics
  2. MVP Demo Version of Application Frontend
  3. MVP Demo Version of Web3.0 Backend (simulated)
  4. Updated Development Specification for future Product Development
  5. Business Processes, IAM and Tokenomics Documentation (V00.30)
  6. Frontend Development Documentation (V00.30)
  7. Web3.0 Backend Development Documentation (V00.30)
  8. Migration and Implementation Documentation (V00.30)
  9. Internal Security Review Summary (V00.10)
  10. Internal Legal Review Summary (V00.10)

Acceptance Criteria

  1. MVP release of the Website available
  2. MVP release of Application Frontend Demo available
  3. MVP release of Version of simulated Web3.0 Backend Demo available
  4. Development Documentation available
  5. Internal Security Review Summary documented
  6. Internal Legal Review Summary documented

Evidence of Milestone Completion

We will deliver a brief video in which we will go through the individual outputs, the acceptance criteria and the evidence. The video will cover:

  1. Detailed explanation of the MVP Website
  2. Detailed demonstration of the MVP Application Frontend Demo
  3. Detailed demonstration of the simulated MVP Web3.0 Backend Demo
  4. Explain Development Documentation (all in V00.30 Version)
  5. Explaining Internal Security Review Summary
  6. Explaining Internal Legal Review Summary

Additionally, the validators will get links with read-access to the listed documents and applications.

Final Milestone: Milestone Title

Complete all deliverables, MVP Demo Version released and functional, Ready for customer PoC, Piloting and Roll-outs and formal closing of the project (Completion: End of month 12 of 12):

Milestone Outputs

  1. MVP Version of the Website, supporting the simulation of Business Processes, IAM and Tokenomics
  2. MVP Demo Version of Application Frontend and of Web3.0 Backend (simulated)
  3. Release Requirements Specification (V03.00)
  4. Release Solution Specification (V03.00)
  5. Release Business Model Specification (V03.00)
  6. Release Website supporting the MVP Demo
  7. Released Pitch-Deck and Pitch-Video
  8. Released Development Specification for future Product Development
  9. Business Processes, IAM and Tokenomics Documentation (V01.00)
  10. Frontend Development Documentation (V01.00)
  11. Web3.0 Backend Development Documentation (V01.00)
  12. Migration and Implementation Documentation (V01.00)
  13. Internal Security Review Summary (V01.00)
  14. Internal Legal Review Summary (V01.00)
  15. Internal Project Closing
  16. External Project Closing
  • Closeout Report
  • Closeout Video

Acceptance Criteria

  1. MVP release of the Website available
  2. MVP release of Application Frontend Demo and of simulated Web3.0 Backend Demo available
  3. Release Requirements Specification (V03.00) available
  4. Release Solution Specification (V03.00) available
  5. Release Business Model Specification (V03.00) available
  6. Release Website supporting the MVP Demo available
  7. Released Pitch-Deck and Pitch-Video available
  8. Released Development Specification for future Product Development
  9. Business Processes, IAM and Tokenomics Documentation (V01.00) available
  10. Frontend Development Documentation (V01.00) available
  11. Web3.0 Backend Development Documentation (V01.00) available
  12. Migration and Implementation Documentation (V01.00) available
  13. Internal Security Review Summary (V01.00) available
  14. Internal Legal Review Summary (V01.00) available
  15. Internal Project Closing done
  16. External Project Closing
  • Closeout Report submitted
  • Closeout Video submitted

Evidence of Milestone Completion

We will deliver a brief video in which we will go through the individual outputs, the acceptance criteria and the evidence. As evidence we will provide:

  1. Detailed explanation of the MVP Website
  2. Detailed demonstration of the MVP Application Frontend Demo and of the simulated MVP Web3.0 Backend Demo
  3. Showing and explaining Requirements Specification (V03.00)
  4. Showing and explaining Solution Specification (V03.00)
  5. Showing and explaining Release Business Model Specification (V03.00)
  6. Showing and explaining Website supporting the MVP Demo
  7. Showing and explaining Pitch-Deck and Pitch-Video
  8. Showing and explaining Development Specification for future Product Development
  9. Business Processes, IAM and Tokenomics Documentation (V01.00)
  10. Frontend Development Documentation (V01.00)
  11. Web3.0 Backend Development Documentation (V01.00)
  12. Migration and Implementation Documentation (V01.00)
  13. Showing and explaining Internal Security Review Summary (V01.00)
  14. Showing and explaining Internal Legal Review Summary (V01.00)
  15. Sharing the results of the internal Retrospective Meeting
  16. Closeout Report submitted, Closeout Video presented and submitted

We will also provide the required links for allowing deeper-going review

Who is in the project team and what are their roles?

Project Lead

  • Heinz Gassner, founder and CEO of DLT360 comes from 30+ years of experience in technology marketing, strategic business model development and Digital Transformation leadership positions in renowned manufacturing companies. In addition to this, Heinz has education and experience in general business administration and regulatory matters and is just completing his latest M.Sc. in DLT/Blockchain at University of Malta. Due to his long industry-career, Heinz also has a strong personal network within the business and industry leadership community. Heinz has been engaged with CARDANO since 2017 and is an active player within the Catalyst community since the very first town-hall. See LinkedIn

  • Thorsten Pottebaum, co-founder and CTO of DLT360. Thorsten is also a very active player within the Cardano Catalyst community. Thorsten comes from a background of financial management and has more than 20 years of experience as Enterprise Architect within the IT and cybersecurity space (cybersecurity audit program manager) as well as with business development across multiple markets and industries, including Healthcare, Energy and General Manufacturing.. See LinkedIn

Key Contributors & Corodinators

  • Jonas Weinberger, co-founder of DLT360. Jonas has recently graduated from the Brussels School of Governance. Jonas is a regular contributor to DLT360’s legal workstream and is an active part of the DLT360 research team. Jonas is also our internal mastermind in design, presentation as well as video production. Currently, Jonas is Master Student in Branding, Design and UX at University of Barcelona, Spain. See LinkedIn

  • Guilherme Pereira, co-founder of DLT360, recently completed his M.Sc. in Mechatronics in Sao Paulo, Brazil. Guilherme is our mastermind behind our program- and project management. Guilherme also coordinates our Brazilian free-lancers for back-office and software (PoC) coding. See LinkedIn

Domain Experts from Academia, Industry and Cardano Community

  • During this project, we will consult with our various domain experts from academia and industry for securing the required academic and practical anchoring.

Development Resources and Freelance Assistance

Besides our core-team, this project will be supported by the freelance and partner resources:

  • Back-office team (Brazil)
  • UX design experts and full-stack development team, freelance but closely linked (Brazil)
  • Domain Experts from industry and academia for assisting us on demand
  • External partnerships

Please provide a cost breakdown of the proposed work and resources

Image file

Image file

Image file

Image file

Image file

This project builds on the results of our Fund 12 CONCEPT project (1200104), which is proceeding well and will be completed way before the starting with Fund 13 work.

The Fund 12 CONCEPT is dedicated to understand, which DAO-applications are sufficiently promising for justifying subsequent MVP developments. This is done together with our industry-expert-community and with consulting DAO-related partners from the CARDANO Community.

With the completion of Milestone 1 of the Fund 12 project early September 2024, we have already know that we will focus on DAO applications supporting Idea & Innovation Management within business and industry corporations. This MVP Demo Development Project is the logical next step.

How does the cost of the project represent value for money for the Cardano ecosystem?

1) VALUE

Pease note that this project can produce VERY substantial value. With this approach, many of the historic mistakes of developing premature applications before understanding product/market-fit (customer needs and implementation context) can be avoided. This auditShare MVP development helps avoiding such issues and provides the foundation for finally getting to real-world-adoption at scale.

2) MONEY

The following background is important for understanding the calculation of our average global hourly rates:

  • For the applied average hourly rates, please note that the DLT 360 Team is located in Europe, UK and Brazil. We also need to engage high-level external experts on-demand, coming from various disciplines in academia and industry. This requires rather high hourly rates, which are influencing the overall averages.
  • Whenever possible, we are allocating tasks to our team in Brazil (eg. back-office work, project management work, research and development assistance)
  • Our applied (average) hourly rates cover
  • Costs for travel & accommodation
  • General administration, operations and marketing overhead
  • Costs of general office infrastructure and tools
  • Tax, insurances and social security expenses
  • Special crypto-related legal and tax consulting expenses
  • EXCHANGE RATE RISK MANAGEMENT
close

Playlist

  • EP2: epoch_length

    Authored by: Darlington Kofa

    3m 24s
    Darlington Kofa
  • EP1: 'd' parameter

    Authored by: Darlington Kofa

    4m 3s
    Darlington Kofa
  • EP3: key_deposit

    Authored by: Darlington Kofa

    3m 48s
    Darlington Kofa
  • EP4: epoch_no

    Authored by: Darlington Kofa

    2m 16s
    Darlington Kofa
  • EP5: max_block_size

    Authored by: Darlington Kofa

    3m 14s
    Darlington Kofa
  • EP6: pool_deposit

    Authored by: Darlington Kofa

    3m 19s
    Darlington Kofa
  • EP7: max_tx_size

    Authored by: Darlington Kofa

    4m 59s
    Darlington Kofa
0:00
/
~0:00