completed
CC Admin Team Scope Expansion
Current Project Status
Complete
Amount
Received
$15,000
Amount
Requested
$15,000
Percentage
Received
100.00%
Solution

Provide remuneration for the CC Admin Team to support the functions and operations of, and transitions between the Catalyst Circle

Problem

Without ongoing funding, the CC Admin Team cannot fulfill its role in supporting the functions and operations of the Catalyst Circle.

Addresses Challenge
Feasibility
Auditability

Team

1 member

close

Playlist

  • EP2: epoch_length

    Authored by: Darlington Kofa

    3m 24s
    Darlington Kofa
  • EP1: 'd' parameter

    Authored by: Darlington Kofa

    4m 3s
    Darlington Kofa
  • EP3: key_deposit

    Authored by: Darlington Kofa

    3m 48s
    Darlington Kofa
  • EP4: epoch_no

    Authored by: Darlington Kofa

    2m 16s
    Darlington Kofa
  • EP5: max_block_size

    Authored by: Darlington Kofa

    3m 14s
    Darlington Kofa
  • EP6: pool_deposit

    Authored by: Darlington Kofa

    3m 19s
    Darlington Kofa
  • EP7: max_tx_size

    Authored by: Darlington Kofa

    4m 59s
    Darlington Kofa
0:00
/
~0:00