not approved
CARDANO TO THE EYES OF AFRICA
Current Project Status
Unfunded
Amount
Received
$0
Amount
Requested
$25,000
Percentage
Received
0.00%
Solution

WHAT IS IMPORTANT TO ENSURE THAT THE PROJECT IS WELL KNOWN AND USE IN THE LOCAL AREAS OF AFRICA THIS CAN BE DONE BY FACIAL ACTION AND REAL ACTIVITIES.

Problem

PROBLEM:

THE CARDANO TO THE EYES OF AFRICA IS NOT SEEN AS OTHER PROJECT AND AS ITS ECOSYSTEM IS NOT AS MUCH USE AROUND. THIS IS PRACTICALLY MEANS THAT DUE TO LOW EXPOSURE AND EXPERIENCE.

Impact / Alignment
Feasibility
Auditability

Team

2 members

close

Playlist

  • EP2: epoch_length

    Authored by: Darlington Kofa

    3m 24s
    Darlington Kofa
  • EP1: 'd' parameter

    Authored by: Darlington Kofa

    4m 3s
    Darlington Kofa
  • EP3: key_deposit

    Authored by: Darlington Kofa

    3m 48s
    Darlington Kofa
  • EP4: epoch_no

    Authored by: Darlington Kofa

    2m 16s
    Darlington Kofa
  • EP5: max_block_size

    Authored by: Darlington Kofa

    3m 14s
    Darlington Kofa
  • EP6: pool_deposit

    Authored by: Darlington Kofa

    3m 19s
    Darlington Kofa
  • EP7: max_tx_size

    Authored by: Darlington Kofa

    4m 59s
    Darlington Kofa
0:00
/
~0:00