What are the key milestones you need to achieve in order to complete your project successfully?
Milestone 1: Design and Prototype
Duration: 2 months
- Outputs:
- A detailed system architecture document outlining the technical specifications, data flow, and user interface design.
- A functional prototype demonstrating the core capabilities of visualizing transaction flows on the Cardano blockchain.
- Acceptance Criteria:
- System architecture meets all outlined specifications and supports scalability.
- Prototype is capable of fetching and displaying transaction data in a basic diagram format.
- Evidence:
- System architecture documents reviewed and approved by the technical team.
- Video demonstration and user testing feedback on the prototype.
Milestone 2: Full Development and Initial Testing
Duration: 3 months
- Outputs:
- Fully developed application ready for extensive testing, integrating real-time transaction data and comprehensive graphical representations.
- Integration of Cardano Shield for security analysis.
- Integration with Xerberus for Risk rating analysis
- Initial testing reports including performance benchmarks and user interface usability.
- Acceptance Criteria:
- The application performs reliably with real-time data, maintaining performance standards under varying loads.
- User feedback indicates high usability and satisfaction with the interface.
- Evidence:
- Test reports documenting performance metrics.
- Usability study results and adjustments made based on feedback.
Milestone 3: Security Auditing and Final Adjustments
Duration: 2 months
- Outputs:
- Security-audited application with all known vulnerabilities addressed.
- Tools to summarize transaction data and highlight critical risks or anomalies
- Acceptance Criteria:
- Tools effectively aid users in identifying significant transaction details and potential threats.
- Evidence:
- Final testing reports showing compliance with all performance and security requirements.
Milestone 4: Launch and Marketing
Duration: 1 month
- Outputs:
- Official public release of the Ada Flow application.
- Comprehensive marketing campaign executed, including press releases, social media, and community outreach.
- Acceptance Criteria:
- Successful launch with media coverage and initial user adoption.
- Reach predefined adoption targets within the first month of release.
- Evidence:
- Media coverage reports and marketing materials.
- Analytics reports showing user adoption rates and application usage statistics.
Final Milestone: Post-Launch Support and Iteration
- Outputs:
- Collection of user feedback for future improvements and documentation of frequently asked questions and solutions.
- Acceptance Criteria:
- Regular updates released addressing user feedback and emerging needs.
- Evidence:
- Update logs and version history documenting iterative improvements based on user feedback.