Login to follow Stephen Whitenstall

Stephen Whitenstall gravatar Stephen Whitenstall QA-DAO Claim Account
Follow

Bio

Stephen has 30 years experience in organizing academic, community and business projects.

Stephen Whitenstall own proposals

Community Reviews across funding rounds

907
Total reviews
Addresses Challenge
4.64 Star
Feasibility
4.35 Star
Auditability
4.55 Star
Value for money
4.02 Star
Impact Alignment
4.16 Star
Impact / Alignment
4.53 Star
Value for Money
4.02 Star

Proposals Across Funding Rounds

16
Completed
16
Approved
23
Proposed
₳245.4K
$194K
Requested
₳0
$167.1K
Awarded
₳0
$167.1K
Received

Funding data last updated

Stephen Whitenstall Proposals (49)

Visual DAO Framework

$72,350 Requested

<p>DAO simulation & visualization is not accessible.</p>

Challenge: Fund 6
not approved Requested 1.809% of the fund.
0 (1)

Weekly Swarm Sessions

$9,000 Requested

<p>The Catalyst community needs organized spaces to discuss and brainstorm on current issues and projects</p>

Challenge: Fund 6
over budget Requested 0.225% of the fund.
0 (1)

Catalyst-Swarm-Genesis GitBook

$3,480 Received
$3,480 Requested

<p>Documentation of Catalyst-Swarm, a self organizing community supporting the success of Project Catalyst, requires support to be sustainable.</p>

Challenge: Fund 6
completed Awarded 0.087% of the fund.
0 (1)

IDEA FEST for Fund 6 + 7

$35,000 Received
$35,000 Requested

<p>There is a lack of interaction between proposers and voters in Project Catalyst</p>

Challenge: Fund 6
completed Awarded 0.875% of the fund.
0 (1)

Distributed Auditability

$8,720 Received
$8,720 Requested

<p>No common audit standards in funded proposals.</p><p><br></p><p>No consistent evaluation of funded proposals.</p><p><br></p><p>Funded reporting is manual.</p>

Challenge: Fund 6
completed Awarded 0.218% of the fund.
0 (1)

Ryuki Funding

$35,000 Requested

Solution: Create a Socio-Financial Community Treasury defined as holocratic, united network of coordinated project based Stake Pools & Treasuries

Challenge: Fund 7
over budget Requested 0.438% of the fund.
0 (1)

Catalyst Fund 8 Challenge Team Hub

$7,012 Requested

Solution: Provide and maintain a single source of information and documentation for the F8 Challenge Team community.

Challenge: Fund 7
over budget Requested 0.088% of the fund.
0 (1)

Ekphrasis Gitbook

$4,350 Received
$4,350 Requested

Solution: Resource the documentation of philosophical debate and discussion around Cardano.

Challenge: Fund 7
completed Awarded 0.054% of the fund.
0 (1)

Distributed Autonomous Accelerator

$55,000 Requested

Solution: Conduct a research project for a radical decentralized blockchain accelerator that nurtures teams that are worth investing in any context.

Challenge: Fund 7
over budget Requested 0.688% of the fund.
0 (1)

Challenge: Distributed Governance

$200,000 Budget

How can the Catalyst community develop, implement and sustain distributed governance?

Proposed in Fund:
Budget 2.5% of the fund.
0 (1)

Automate, Educate, Communicate

$9,750 Received
$9,750 Requested

Solution: A Catalyst School, QA-DAO & Treasury Guild partnership will offer incentivized development, training materials & open-source communication

Challenge: Fund 8
completed Awarded 0.061% of the fund.
0 (1)

NFT Guild: Cardano NFT Reports

$56,277 Requested

Solution: Create a reliable and impartial source of in-depth reports, published regularly & authored by Cardano NFT insiders and QA specialists.

Challenge: Fund 8
over budget Requested 0.352% of the fund.
0 (1)

QA-DAO Oversight of Catalyst Circle

$16,143 Received
$16,143 Requested

Solution: Provide independent oversight of Catalyst Circle. Resource the Circle GitBooks to document & track the activities of Circle v4 and v5.

Challenge: Fund 8
completed Awarded 0.101% of the fund.
0 (1)

Grassroots Governance Community Forums Quick Pitch

₳48,000 Requested

Solution: Organize and deliver four Grassroots Governance Community Forums to bring together diverse individuals and projects across Cardano and other web3 ecosystems to address pressing governance questions

Challenge: Fund 10
not approved Requested 0.096% of the fund.
0 (1)

Nanopublications Dashboard: a searchable natural language tool for atomic knowledge-sharing

₳82,800 Requested

Solution: Build a dashboard to collate clear, atomic, searchable learning points from Catalyst projects (similar to nanopublications, but more accessible); and provide training in how to submit material to it.

Challenge: Fund 10
not approved Requested 0.166% of the fund.
0 (1)

Advancing Community Governance Tooling on Andamio Quick Pitch

₳109,400 Requested

Solution: Ease learning of governance models & boost collaboration through the project-based learning Andamio framework, using on-chain tools to experiment & validate the effectiveness of teaching such models.

Challenge: Fund 10
not approved Requested 0.219% of the fund.
0 (1)

Open Source Strategy

₳56,800 Requested

Solution: We will provide information, guidance and videos on Open Source Strategy, what Open Source licenses mean, how to implement them, how to use Open Source tools and build an Open Source culture.

Challenge: Fund 10
not approved Requested 0.114% of the fund.
0 (1)

Skin in the Game and Agency Theory

₳40,400 Requested

Solution: Research, develop and publish an Agency Theory approach to Cardano decentralization metrics.

Challenge: Fund 11
not approved Requested 0.081% of the fund.
0 (1)

Monthly Reports

We are involved in a few projects and all of them have different approaches when it comes to project management. We are continuesly looking at these different approaches and trying to identify possible automations. We noticed a lot of groups using dework and trying to identify a way to integrate GitHub with Dework and the processes involved to make the automations on GitHub's side effective. Dework has some issues feeding information to GitHub so we need to create a process that feeds from GitHub to Dework.

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
3. In the next 6 months
Comments 0

Login or Register to leave a comment!

We are gathering information from the other projects we are involved in. Every project has a different way of doing project management and reporting. We will use the information we gather to identify new automations. GitHub is also receiving new updates which will enable new kinds of automations. We will look at these new updates as they roll out. Once we identified any possible automations we will put them on the project board.

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
3. In the next 6 months
Comments 0

Login or Register to leave a comment!

We are involved and doing research in another project (Governance Services Guild) where we are trying to identify automations that can be done on the project board that also integrates with dework. We have seen opportunities for automations, but more iterations is needed to refine the weekly processes. Once patterns are identified and verified to be consistent, we can dedicate to automating those processes. Whatever we find in this research will be brought over to this project to document and use as inspiration for more possible automations. We also closed a few tasks on the project board this month, mostly admin work, making room for more automation work.

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

The dRep White Paper Working group completed a community review of its White Paper and is preparing to launch the paper in October 2022. Biweekly meetings of Fund 8 CGO resumed after an August break in September 2022 and discussed what governance oversight deliverables to focus on. The areas of interest are likely to be a register of parameter changes in Catalyst and oversight of the upcoming Catalyst Circle Election.

Disbursed to Date
$34,300
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

Following our first video "Project Catalyst and the Voltaire Principles" we are commissioning translations into Spanish and Portuguese. Other videos are in research and preparation.

Disbursed to Date
$10,135
Status
Still in progress
Completion Target
3. In the next 6 months
Comments 0

Login or Register to leave a comment!

The project is complete; but the team has not had time yet to complete a close out report. We aim to do this in the coming month. Ongoing documetation of Catalyst Circle continues with the F8 proposal 800305

Disbursed to Date
$7,440
Status
Complete
Completion Target
1. In the next month
Attachment(s)
Comments 0

Login or Register to leave a comment!

We are working on our final report, which will be shared with homeless organisations in the UK; and on the project website, which will be launched on 3rd Oct.

Disbursed to Date
$18,980
Status
Complete
Completion Target
1. In the next month
Comments 0

Login or Register to leave a comment!

We took a hiatus for the month of August, as many people in the community are on holiday or away.

This month, we have been meeting to discuss project wrap-up and legacy - given that it seems unlikely, that our follow-on F9 proposal, The Proposers' Hive, will be funded due to heavy competition in the big "dApps and products" challenge, we are considering what we can usefully leave behind which will be of value to proposers long-term; to this end, we analysed the things that proposers have raised via the question below on the monthly reporting form ("Is there anything you would like to communicate… ideas or recommendations for improvements?") We are also discussing what we have learnt from this proposal about proposers' needs, and about team working across communities and time zones, with a view to writing our close-out report; and we are also attending meetings and working with proposers in our various communities, updating our Miro board to collate sensed issues, and contributing insights from here to the main Catalyst docs on process improvement for F9.

Disbursed to Date
$14,215
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

We continued testing the new automated Agenda on our project board and so far there hasn't been any errors or bugs. We had to transfer and update our Gitbook with all the changes we made to the project to prepare for work we will do on possible Fund 9 proposals. We created an automation that automatically labels a newly created Issue on the project board with ADA Due. So essentially we will only add items on the project board if they are payable tasks. We started documentation in our Gitbook on these newly created automations.

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

Further information can be found on our CGO GitBook at https://quality-assurance-dao.gitbook.io/community-governance-oversight/ We completed our Fund 7 CGO proposal and gave a presentation at TH Our dRep White Paper working party has started accepting community reviewers

Disbursed to Date
$34,300
Status
Still in progress
Completion Target
3. In the next 6 months
Comments 0

Login or Register to leave a comment!

We are working on follow-up videos

Disbursed to Date
$10,135
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

We are dropping bounty system for the following reasons.

We struggled to add items to the bounty wish list. We saw that funded projects need help with treasury and project management In order to design automations we would need to research what is needed in these projects as they are all different from each other. Research can be done by helping funded projects and identifying new automations in the process. Decided to shift our focus to doing this research and create automations where needed. We found that our own resources were sufficient to develop GitHub actions and there was insufficient bounty applications

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
2. In the next 3 months
Comments 0

Login or Register to leave a comment!

Disbursed to Date
$10,135
Status
Still in progress
Completion Target
3. In the next 6 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

Disbursed to Date
$34,300
Status
Still in progress
Completion Target
3. In the next 6 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

The final report is near completion.

Disbursed to Date
$19,100
Status
Complete
Completion Target
1. In the next month
Attachment(s)
Comments 0

Login or Register to leave a comment!

Here is the link to the project GitBook where Catalyst Circle v3 is being documented https://quality-assurance-dao.gitbook.io/catalyst-circle-oversight-v3/

Disbursed to Date
$7,440
Status
Complete
Completion Target
1. In the next month
Attachment(s)
Comments 0

Login or Register to leave a comment!

Here is a link to the Funded Proposers Hub GitBook, where we collate the work that we have been doing https://catalyst-circle.gitbook.io/funded-proposers-hub/

This month, our focus has been on supporting proposers to flag proposals. So we have written a guide to this, and managed translations into 7 languages (translations funded by Circle Rapid Funding Mechanism).

We also produced videos on how to flag, in Spanish https://youtu.be/LBuNE7KIXgY, English https://youtu.be/LzRoI7FnSXA , and Vietnamese https://youtu.be/uZp8U0Kf8NQ

Disbursed to Date
$14,215
Status
Still in progress
Completion Target
1. In the next month
Attachment(s)
Comments 0

Login or Register to leave a comment!

Here is a link to the Catalyst After Town Hall that the project ran on 29th June 2022 https://youtu.be/xVzXwG5Z_lE

Also, 6 of the participants from this project have formed a team called Homeless Posse and have submitted a Fund 9 proposal with support from Vanessa (the facilitator on this project) and from Catalyst proposers SnapBrillia. Here is a link to it https://cardano.ideascale.com/c/idea/421065

Here is the project’s GitBook, which we are populating with documentation of all the sessions https://quality-assurance-dao.gitbook.io/homeless-hub/

Disbursed to Date
$18,980
Status
Still in progress
Completion Target
1. In the next month
Attachment(s)
Comments 0

Login or Register to leave a comment!

We finished our old proposals and started planning on the work for this proposal. We will begin work early next month. Please continue to halt the release of funds for this project. We will ask for funding again when work has been done. Here is a link to our project board in GitHub - https://github.com/orgs/Catalyst-Auditing/projects/5/views/1

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
2. In the next 3 months
Attachment(s)
Comments 0

Login or Register to leave a comment!

Our GitBook is here https://catalyst-circle.gitbook.io/funded-proposers-hub/ This was initially created during a previous funded proposal to support proposers; but here is some recent work we have done to create proper guidance notes (in English) for the proposal submission form. https://catalyst-circle.gitbook.io/funded-proposers-hub/help-with-proposing-in-catalyst/proposers-guidance-notes-multi-lingual

The notes were translated into 5 additional languages using fundingfrom Circle's Rapid Funding Mechanism.

Disbursed to Date
$14,215
Status
Still in progress
Completion Target
8/31/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

The project end date is revised later than in the original bid, because we meet on Mondays, and there have been 3 bank holidays (no meeting) which we forgot to account for, which pushed the project schedule back.

Participants are currently working on a final piece to engage other homeless organisations and people in poverty in Salford, inviting them via a website to discuss questions about wealth and poverty, the financial system, crypto, etc. They are using the slogan "Don't count your chickens - anyone can face homelessness", and using painted images of a chicken (see uploaded images for 2 works-in-progress) which will be placed in several local places such as food banks, credit unions, and homelessness support organisations. The images will bear a QR code linking to a website where people can add comments and opinions. These will also be shared digitally with the Catalyst community in July.

The participants are also going to deliver an ATH session on 29th June; and are also submitting a proposal in fund 9 for a project to engage further with the Cardano blockchain.

Disbursed to Date
$18,980
Status
Still in progress
Completion Target
7/30/2022
Comments 0

Login or Register to leave a comment!

Here is the link to the project GitBook where Catalyst Circle v3 is being documented https://quality-assurance-dao.gitbook.io/catalyst-circle-oversight-v3/

Disbursed to Date
$7,440
Status
Complete
Completion Target
7/15/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

We have mostly just been closing off the old proposals and getting everything ready for this new proposal. Once we have closed the old ones we will start creating the environment for this proposal. This includes setting up dework and a list of bounties that people from the community can take. We have been meeting mostly twice a week to work on this. Another thing we've been working on passively is using the project board and trying to identify ways of automating some of the actions we do every week. The idea is to find a way to use the project board a certain way and then automate a bunch of things and possibly create content that can assist in the monthly and close out report.

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
9/1/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
7/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
7/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
7/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$3,480
Status
Complete
Completion Target
1/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$8,720
Status
Complete
Completion Target
6/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$8,720
Status
Complete
Completion Target
6/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$10,135
Status
Still in progress
Completion Target
9/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$34,300
Status
Still in progress
Completion Target
9/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$19,100
Status
Still in progress
Completion Target
7/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$12,700
Status
Still in progress
Completion Target
7/1/2022
Comments 0

Login or Register to leave a comment!

Not yet!

Disbursed to Date
$14,215
Status
Still in progress
Completion Target
8/31/2022
Comments 0

Login or Register to leave a comment!

Project end date is revised later, because we meet on Mondays, and there have been 3 bank holidays where we have had no meeting, which we forgot to account for, which has pushed the project schedule back.

4 project participants attended Town Hall and ATH on Weds 18th May, and the group is now planning to deliver an ATH session themselves.

Disbursed to Date
$18,980
Status
Still in progress
Completion Target
7/30/2022
Comments 0

Login or Register to leave a comment!

Here is the link to the project GitBook where Catalyst Circle v3 is being documented https://quality-assurance-dao.gitbook.io/catalyst-circle-oversight-v3/

Disbursed to Date
$7,440
Status
Still in progress
Completion Target
5/31/2022
Comments 0

Login or Register to leave a comment!

This is a link to our Gitbook where we document everything - https://quality-assurance-dao.gitbook.io/training-and-automation/introduction-and-pat-tokens/introduction-to-github-actions - And here is a link to our GitHub repo project board - https://github.com/orgs/Catalyst-Auditing/projects/5/views/1 - We created a project board and discussed and added action items.

Disbursed to Date
$9,750
Status
Still in progress
Completion Target
9/1/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/ekphrasis/

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
5/26/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://catalyst-circle.gitbook.io/funded-proposers-hub/

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
5/26/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://catalyst-swarm.gitbook.io/catalyst-swarm-2022/

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
7/1/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/audit-circle/project-management/overview

Disbursed to Date
$12,700
Status
Still in progress
Completion Target
6/15/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/community-governance-oversight/project-management/overview

Disbursed to Date
$19,100
Status
Still in progress
Completion Target
6/15/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/training-and-automation/

Disbursed to Date
$8,720
Status
Still in progress
Completion Target
6/1/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/training-and-automation/

Disbursed to Date
$8,720
Status
Still in progress
Completion Target
6/1/2022
Comments 0

Login or Register to leave a comment!

n/a

Disbursed to Date
$3,480
Status
Complete
Completion Target
1/1/2022
Comments 0

Login or Register to leave a comment!

Attached is an audio excerpt from a Zoom conversation on 11th April 2022 between the Homeless Hub group and Littercoin, another Catalyst funded proposal, about tokenising what we value, citizen science, and open data. This project does not plan to create a token, but the group wanted to find out more about how tokens work.

Disbursed to Date
$18,980
Status
Still in progress
Completion Target
6/30/2022
Attachment(s)
Comments 0

Login or Register to leave a comment!

Here is the link to the project GitBook where Catalyst Circle v3 is being documented https://quality-assurance-dao.gitbook.io/catalyst-circle-oversight-v3/

Closing date of the project - in the last monthly report, I miscounted that it was 30th April. Actually 12th May (end of 6th meeting of Circle v3)

Disbursed to Date
$7,440
Status
Still in progress
Completion Target
5/12/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://catalyst-circle.gitbook.io/catalyst-coordinator/

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
5/26/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://catalyst-swarm.gitbook.io/catalyst-swarm-2022/

Disbursed to Date
$4,350
Status
Still in progress
Completion Target
12/31/2022
Comments 0

Login or Register to leave a comment!

GitBook Project is complete (https://catalyst-swarm.gitbook.io/catalyst-swarm-genesis) but need to produce closing video

Disbursed to Date
$3,480
Status
Complete
Completion Target
1/1/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/training-and-automation/

Disbursed to Date
$8,720
Status
Still in progress
Completion Target
5/26/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/training-and-automation/

Disbursed to Date
$8,720
Status
Still in progress
Completion Target
5/26/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/audit-circle/project-management/overview

Disbursed to Date
$12,700
Status
Still in progress
Completion Target
5/26/2022
Comments 0

Login or Register to leave a comment!

Evidence & information about the progress of this project can be found here - https://quality-assurance-dao.gitbook.io/community-governance-oversight/project-management/overview

Disbursed to Date
$19,100
Status
Still in progress
Completion Target
5/19/2022
Comments 0

Login or Register to leave a comment!

I am behind with documentation. By next monthly report, I will have a GitBook available with blogs, session documentation, images and video from the project.

Disbursed to Date
$18,980
Status
Still in progress
Completion Target
5/30/2022
Comments 0

Login or Register to leave a comment!

Here is the link to the project GitBook where Catalyst Circle v3 is being documented https://quality-assurance-dao.gitbook.io/catalyst-circle-oversight-v3/

NB The GitBook is the main "evidence" of the project's progress - it would be great if the "please share any evidence" field also included space for text, where links can be added.

Disbursed to Date
$7,440
Status
Still in progress
Completion Target
4/30/2022
Comments 0